Merseyside Recycling Centre
IMPROVING YOUR ENVIRONMENT AND HEALTH BY SORTING, RECYCLING AND REUSING OUR WASTE WISELY.
- Construct Bids secured the contract to design and install the infrastructure for a new high-level fire suppression system requiring specialist scaffolding and access to protect a large Merseyside paper recycling facility from fire. Our design ensured that the plant continued to operate without any shut-down requirements.
- Replacement of a partially fire-damaged roof while maintaining our client’s operations.
- Value £700K.
PROJECT COMPRISES OF
- Specialist scaffold and access to the warehouse roof space.
- Ground investigations included Unexploded Ground Ordinance surveys at the site.
- Driven steel piles and concrete foundation slab to support an 800,000 ltr fire water tank.
- Management of the fire suppression tank and sprinkler system installation.
- Designing and installing the necessary electrical power to run the fire suppression system.
- Site modelling and installation of flood retention barriers to contain fire water if required and prevent pollution of land and sewers.
PARTIES
- Client – Available on request.
- Construct Bids – Principal Contractor, Design and Build Contractor.
- RSK Group Site investigations and overall design responsibilities.